• Civil Aviation •     Next Articles

Implementation of track estimation based on flight plan for general aviation

WU Ren-biao,LIU Yan-bin,WANG Xiao-liang   

  1. (Tianjin Key Laboratory for Advanced Signal Processing,CAUC,Tianjin 300300,China)
  • Received:2012-11-09 Revised:2012-12-26 Online:2014-02-24 Published:2014-01-02

Abstract:

A track estimation method is presented which utilizes aircraft performance parameters based on flight plan for general aviation aircraft. The track estimation method employs three-stage flight model which includes climb,cruise and descent. Then the aircraft performance parameters in different flight levels are employed to calculate durations in climb and descent stage. A track points pairing method is also presented,which could be utilized in track estimation updating. The method is implemented by C++ and applied in general aviation flight data processing system successfully.

Key words: general aviation, flight plan, track estimation, track pairing

CLC Number: