| [1] |
LETTOYSKY L. Airline operations recovery: an optimization approach[D]. Atlanta: Georgia Institute of Technology, 1997.
|
| [2] |
乐美龙, 王倩倩. 动态时空衔接的一体化恢复[J]. 辽宁工程技术大学学报(自然科学版), 2014, 33(5): 696-699.
|
| [3] |
朱博, 朱金福, 高强. 飞机和机组一体化恢复的约束规划模型[J].交通运输工程学报, 2013, 13(1): 77-83.
|
| [4] |
BISAILLON S, FRANCOIS J, GILBERT L, at al. A large neighborhood search heuristic for the aircraft and passenger recovery problem[J]. A Quarterly Journal of Operations Research, 2011, 9(2): 139-157.
|
| [5] |
SINCLAIR K, JEAN F, GILBERT L. A column generation post-optimization heuristic for the integrated aircraft and passenger recovery problem[J]. Computers & Operations Research, 2016, 65: 42-52.
|
| [6] |
TEODOROVIC D, GUBERINIC S. Optimal dispatching strategy on an airline network after a schedule perturbation[J]. European Journal of Operational Research,1984, 15(2): 178-182.
|
| [7] |
TEODOROVIC D A. model for designing the meteorologicany most reliable airline schedule[J]. European Journal of Operational Research,1985, 21(2): 156-164.
|
| [8] |
TEODOROVIC D, STOJKOVIC G. Model for operational daily airline scheduling[J]. Transportation Planning and Technology, 1990, 14(4):273-285.
|
| [9] |
TEODOROVIC D, STOJKOVIC G. Model to reduce airline schedule disturbances[J]. Journal of Transportation Engineering, 1995, 121(4):324-331.
|
| [10] |
吴刚, 严俊. 不正常航班恢复的一种改进的列生成算法[J]. 南京航空航天大学学报, 2014, 46(2): 329-334.
|
| [11] |
田倩南, 李昆鹏, 李文莉, 等. 受扰航班恢复问题的优化方案研究[J].管理学报, 2018, 15(10): 1081-1088.
|
| [12] |
HANIF D, BAE K H, MOHAMED H. An integrated approach for airline flight selection and timing, fleet assignment, and aircraft routing[J].Transportation Science, 2013, 47(4): 455-628.
|
| [13] |
AKTURK M S, ATAMTURK A, GUREL S. Aircraft rescheduling with cruise speed control[J]. Operational Research. 2014, 62(4): 829-845.
|
| [14] |
UGUR A, SINAN G M, SELIM A. Integrated aircraft and passenger recoverywith cruise time controllability[J]. Annals of Operations Research,2016, 236(13): 295-317.
|
| [15] |
LIANG ZHE, FAN XIAO, QIAN XIONGWEN. A column generationbased heuristic for aircraft recovery problem with airport capacity constraints and maintenance flexibility[J]. Transportation Research Part B,2018, 113(5):70-90.
|