• Civil Aviation Management • Previous Articles     Next Articles

Planning and design of Luyang Lake General Aviation Airport

GUO Quan-quan1,KE Fei1,LI Qian1,2,HUANG Da-hai1   

  1. (1. School of Transportation Science and Engineering,Beijing University of Aeronautics & Astronautics,Beijing 100191,
    China;2. Beijing Institute of Architectural Design,Beijing 100045,China)
  • Received:2013-10-23 Revised:2014-02-27 Online:2015-04-22 Published:2015-06-09

Abstract:

Combined with the specificity of Luyang Lake General Aviation Airport,such as complex function,aircraft type diversification,various levels of the flight crew and so on,the airfield grade is confirmed as well as the orientation,length,width of the hard runway,grass runway and water runway adjusted to the specification parameters. Based on the traffic organization's convenience,fight safety,the minimal impact to other functional areas and the optimal viewing angle,the southeastern scheme is adopted from 3 site layout schemes. Besides,the weighted equivalent continuous perceive noise level LWECPN is adopted to calculate and analyze the airport noise exposure level,and some corresponding suggestions are put forward for other functional areas'planning.

Key words: general aviation, functional orientation, runway design, airport site selection

CLC Number: