[1] GLOVER F,JONES G,KARNEY D. An integrated production,distribution,and inventory planning system[J]. Interfaces,1979,9:21-35.[2] BLUMENFELD D E,BURNS L D,DAGANZO C F. Synchronizing production and transportation schedules[J]. Transportation Res,1991,Part B 25:23-37.[3] HOLMBERG K,TUY H. A production-transportation problem with stochastic demand and concave production costs[J]. Mathematical Programming,1999,85:157-179.[4] LIUB.TheoryandPracticeofUncertainProgramming[M].2nded.Berlin:Springer-Verlag,2009.[5] LIU B. Uncertainty Theory[M]. 4th ed. Berlin:Spinger-Verlag,2013.[6] RONG L. Two new uncertainty programming models of inventory with uncertain cost[J]. Journal of Information and Computational Science,2011,8(2):208-288.[7] MOU D Y,ZHAO W L,CHANG X D. A transportation problem with uncertain truck times and unit costs[J]. Industrial Engineering And Management Systems,2013,12(1):30-35.[8] GAO Y. Uncertain models for single facility location problem on networks[J]. Applied Mathematical Modelling,2012,36(6):2592-2599.